Friday, November 15, 2013

15th Nov 2013 - Materials Selection Day

Meet ID at 4.30pm after our HDB appointment and left around 7.30pm. Spent a total of 3hrs to chose and confirm on laminates, paint color, stone top, stucco wall etc. At the end of the session, super tired and hope I can still remember what we chose. ID will proceed to change the 3D drawing and also start with the detail drawing. By then should be able to visualise better. Some of the materials we chose today.








No comments: